Campus track
Design elasticity, anti-slip and durability according to foundation, climate, usage intensity and teaching scene.
DPU | BASF&DBC
From campus runways, courts, kindergarten activity areas to professional venues and urban trails, DPU puts basic diagnosis, elastic layer, surface layer, anti-skid, wear-resistant, construction climate, acceptance and maintenance into the same project system.

The type of movement, foundation conditions, climate drainage, intensity of use and maintenance methods jointly determine the system structure; material selection must be synchronized with on-site construction and acceptance indicators.
Design elasticity, anti-slip and durability according to foundation, climate, usage intensity and teaching scene.
Grip, rebound, friction and marking systems for different ball sports.
Taking into account cushioning, anti-slip, color, cleaning and high-frequency use.
Connecting continuous paving, weathering, drainage, maintenance and public space use.
Basic treatment, primer, elastic layer, reinforcement layer, surface layer and marking are controlled layer by layer.
Site survey, plans, prototypes, construction, quality records, acceptance and maintenance.
Elastic buffering, outdoor weather resistance, water-based construction and project site respectively correspond to materials, processes and delivery links, jointly explaining the system capabilities.




Submit the site use, foundation conditions, area, climate drainage, usage intensity and delivery nodes, and the engineering team will establish the layer structure, template and construction plan.
Clarify the type of exercise, user groups, area and frequency
Investigate strength, flatness, drainage, cracks and climate
Design layer structure and complete color and performance templates
Control process, dosage, climate window and on-site records
Complete acceptance, usage disclosure and maintenance plan
Starting from the on-site foundation, usage intensity and delivery goals, a sports ground system that can be constructed, accepted and maintained is formed.