DPU | BASF&DBC | Sports Flooring System

A field is the sum of materials, structure, construction and sports performance.

DPU is oriented to primary and secondary schools, professional venues, children's activity spaces and national fitness scenes. It organizes a complete sports flooring system from grassroots diagnosis, elastic structure, surface performance to on-site acceptance.

Athletes, teachers and students start running on the red track and field track of Peking University
Track · Court · Trail · Children’s surfaceFrom foundation to surface, system performance can be realized in real sites.

Materials technology

Dismantle sports performance into designable, constructable, and verifiable technical variables.

Rather than replacing field performance judgments with a single material name, DPU puts volatile control, elastic cushioning, weather retention, interlayer bonding and surface movement performance into the same system.

DPU ETPU elastic buffer structure diagram
ETPU elastic buffer structure

Through material combination and layer structure, impact absorption, vertical deformation and rebound performance are organized to serve different ages, sports intensity and site uses.

DPU sports flooring volatiles and odor control
Volatile matter and odor control

Organize volatile matter management from raw materials, formulas, construction environment to finished product site, and coordinate with project standards and on-site delivery requirements.

DPU outdoor weather resistance and artificial aging test
Outdoor weather resistance and long-term maintenance

Color, elasticity, abrasion resistance and surface stability are evaluated around sun exposure, rain, temperature differences, frequency of use and maintenance conditions.

Venue system

Different sports spaces require different structures, performance and delivery logic.

From daily physical exercise on campus to professional venues, from children's activities to national fitness trails, DPU splits project routes according to user groups, basic conditions, exercise intensity, climate and acceptance tasks.

University track and field
Professional sports space

Sports venues and athletics tracks

A complete system is organized around professional training, event use, track structure, drainage, surface performance and venue maintenance.

DPU Track and Fitness Trail System Application Portfolio
Campus sports space

Primary and secondary school sports venues

Serving high-frequency daily physical training and campus competitions, from basics, elasticity, anti-skid, wear-resistant, volatile matter control to on-site acceptance collaborative design.

Children exercising on the DPU movable surface
Children's activity space

Kindergarten and children's protective floor

Combining age, activity patterns, risk of falling, boundary nodes and daily maintenance, organize a flexible floor that is more suitable for children's activities.

National Olympic Sports Center Red Fitness Trail
National fitness space

Parks and Urban Fitness Trails

For parks, communities, sports centers and urban greenways, it coordinates footwear, weather resistance, anti-slip, drainage and continuous maintenance.

Urban Renewal Forum showcases fitness trail material system
urban sports space

Stadiums, bike paths and composite paving

Match the color, anti-slip, elasticity, wear resistance and traffic organization according to the needs of ball games, slow traffic systems and public spaces.

05Functional surface

Responsible for anti-slip, wear-resistant, color zoning and sports contact performance.

04Elastic buffer layer

Combining materials such as ETPU and EPDM to achieve targeted foot feel and cushioning performance.

03structural adjustment layer

Control the thickness, flatness, inter-layer bonding and drainage relationship according to the site route.

02High penetration primer

Seals and connects the foundation to provide a stable bonding starting point for subsequent systems.

01Concrete or asphalt foundation

Control strength, water content, smoothness, cracks, slope and drainage conditions.

System layer structure

Starting from the grassroots level determines the final performance of the venue.

Sports flooring is not a layer of color. Basic quality, material system, thickness control, inter-layer combination, construction climate and on-site maintenance jointly determine the elasticity, anti-skid, wear resistance, weather resistance and long-term stability of the site.

Projects and Public Records

Let site experience become the basis for your next project judgment.

DPU's brand strength comes from a long history of material development, site implementation, industry communications and public project records. The following cases cover professional track and field, national fitness, children's space and industry display.

The scene of the first running event of the new semester of Peking University
2024 · Peking University

DPU track and Olympic champion power first run of back-to-school season.

Professional sports venues enter campus life, connecting material systems, sports experience and campus culture with real use.

View project records →
National Olympic Sports Center DPU Fitness Trail
2020 · National Fitness

National Olympic Sports Center Fitness Trail.

Put the elastic foot feel, outdoor weather resistance and continuous use of park trails into the same scene.

View project records →
China Welfare Association Nursery DPU children's sports floor construction
2018 · Children’s Space

China Welfare Society Nursery ETPU Sports Floor.

A scenario-based project is formed around children's activities, ground buffering, construction organization and long-term maintenance.

View project records →

Full process project delivery

From survey to acceptance, every step serves the final performance of the site.

Put materials, construction parties, inspection and construction units into the same project path to reduce information fragmentation and on-the-spot changes, so that on-site results can return to the original design goals.

01 / SurveyDiagnosis of basic conditions

Confirm foundation strength, smoothness, water content, cracks, drainage, and existing structures to establish a starting point for the system.

02/DesignMaterials and Layer Structure

Determine structural routes and key control points based on site use, sport intensity, crowd and target criteria.

03 / ImplementationModel and construction control

Confirm the material, color, surface and construction process through the sample, and record the temperature, humidity, dosage and inter-layer status.

04 / DeliveryInspection, acceptance and maintenance

Organize on-site inspection, data archiving, usage suggestions and maintenance plans according to project requirements.

DPU runway representative projects and venue display

DPU PROJECT MAP

From campus playgrounds to professional venues and urban sports networks.

A long-term project accumulation covering venues, schools, kindergartens, sports centers, park walks and urban public spaces allows DPU to build experience from different foundations, climates, intensity of use and acceptance conditions.

campus systemTrack · Court · Complex Sports Area
Professional systemVenue · Training · Track and Field Space
children systemKindergarten · Activity area · Protective floor
urban systemTrails·Parks·Slow walking and national fitness

Start with field, fundamentals, and athletic performance goals.

Describe the site type, area, basic status, users, target standards, construction period and project stage, and the DPU team will organize the materials, structure, construction and acceptance path.

Submit DPU project